Wow. Am I right? I don't think we even realized what a project this would be. Just looking at these photos reminds me of how tired I was when we had finished the main floor of the house. That might also have had something to do with the fact that I was 7 months pregnant by time we finished. We decided to strip down the main living floor and pretty much ended up gutting it before we even moved in. Here's the list (I'm sure I'll miss several things on this list) of what we removed:
- Took out all the carpeting (yes there was even carpet in the bathroom as seen above) and linoleum.
- Removed popcorn/asbestos ceiling.
- Removed wallpaper (even from the ceiling).
- Took EVERYTHING out of the bathroom. Carpet, toilet, vanity, mirror, tub, tile, walls.
- Took out almost all of the light fixtures.
- Took out the counter tops and the melamine back splash.
- Removed the existing electrical wiring.
- Removed existing plumbing.